- Joined
- 11 Oct 2026
- Messages
- 1
- Reaction score
- 0
- Country

Hi all,
First time poster here.
I’ve recently been carrying out roofwork on my terrace house. Fitted a velux, replaced lead 2cm x 3cm soakers with 14cm x 10cm and cover flashing on the main house abutment wall with a drip bead rendered in immediately above the lead mate line to ensure it’s bulletproof as I’m on a very exposed steep hill.
Now I’ve turned my attention to the extension finally, I’ve discovered:
- Lead is knackered, cracked in places as they just rolled 3m of it and fixed it in continuous lengths plus its old.
- Ridge tiles are loose with no mortar anywhere.
- Top sloped brick course immediately above the chase for cover flashing is loose.
I’m trying to work out what would be the best way to approach this. I could rebed the tiles and render the small wall drop down to the chase where I’d use leadmate again. But I don’t want to create a situation where when the roof comes to being replaced (probably in a year or so) inserting new lead pops off/cracks the render and single brick/ridge above.
I’m open to any ideas on how to approach this, perhaps even improve this janky setup.
On the other side of the wall is my neighbors yard. A little further back is where his extension ends and the party wall steps up to his roofline.
Thanks,
Alex
First time poster here.
I’ve recently been carrying out roofwork on my terrace house. Fitted a velux, replaced lead 2cm x 3cm soakers with 14cm x 10cm and cover flashing on the main house abutment wall with a drip bead rendered in immediately above the lead mate line to ensure it’s bulletproof as I’m on a very exposed steep hill.
Now I’ve turned my attention to the extension finally, I’ve discovered:
- Lead is knackered, cracked in places as they just rolled 3m of it and fixed it in continuous lengths plus its old.
- Ridge tiles are loose with no mortar anywhere.
- Top sloped brick course immediately above the chase for cover flashing is loose.
I’m trying to work out what would be the best way to approach this. I could rebed the tiles and render the small wall drop down to the chase where I’d use leadmate again. But I don’t want to create a situation where when the roof comes to being replaced (probably in a year or so) inserting new lead pops off/cracks the render and single brick/ridge above.
I’m open to any ideas on how to approach this, perhaps even improve this janky setup.
On the other side of the wall is my neighbors yard. A little further back is where his extension ends and the party wall steps up to his roofline.
Thanks,
Alex