We used to fully rewire (not just first fix) 2 bed terraced houses in 16 man hours.
Tim, I think, is talking man hours - the only proper way to define time on a job.
Otherwise you could put 30 men in there and do it in an hour.
ANd then get all those men standing each by a separate accessory to second fix.
So that is 30 men for 62.5minutes
After that things are gonna slow down - how many men do you think can carry out test and certification at the same time?
And I'll bet you were really proud of the quality of the work, and wouldn't hesitate to have the same in your house today.We used to fully rewire (not just first fix) 2 bed terraced houses in 16 man hours.
Tim, I think, is talking man hours - the only proper way to define time on a job.
Otherwise you could put 30 men in there and do it in an hour.
ANd then get all those men standing each by a separate accessory to second fix.
So that is 30 men for 62.5minutes
After that things are gonna slow down - how many men do you think can carry out test and certification at the same time?
There is a tv program in there somewhere, but you are 2.5 minutes short
We used to fully rewire (not just first fix) 2 bed terraced houses in 16 man hours.
Stood on it?What did you do with the furniture?
4/6/6?How many circuits/Sockets/Lights?
Tim, I think, is talking man hours - the only proper way to define time on a job.
no, his stuff don't work.But does it work?
only when using a lazy low voltage value!And does the toaster affect the laptop when the cold water is running?
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local