I was doing some work at a customers house today and they said the house had only just been rewired.
I casually asked about the work and was shocked/amazed to hear that the two electricians who came to do the job rewired a three bedroom house in two days (staring at 8 am and finishing at 6pm each day)
I wouldn't have thought it was possible to do a full rewire in that time, at least not properly.
Has anyone ever heard of two people completing a rewire that fast?
I casually asked about the work and was shocked/amazed to hear that the two electricians who came to do the job rewired a three bedroom house in two days (staring at 8 am and finishing at 6pm each day)
I wouldn't have thought it was possible to do a full rewire in that time, at least not properly.
Has anyone ever heard of two people completing a rewire that fast?