Went to a job tonight. High Zs on sockets on a PME supply. 4.06.
Asked for the EIC for the board change (18m ago) and the paperwork for extension work - 12 years ago.
The extension paperwork ws non-existant.
The EIC for the board change had a signature on the front, and a few other boxes filled in, but no test results recorded at all. Even the name and address of the firm was missing....
If the customer had been given complete paperwork, they (and the spark) would have know something was amiss...
It beggars belief to me that someone can sign a form to say they have designed, installed & I&T'd an install when they clearly have not.
Asked for the EIC for the board change (18m ago) and the paperwork for extension work - 12 years ago.
The extension paperwork ws non-existant.
The EIC for the board change had a signature on the front, and a few other boxes filled in, but no test results recorded at all. Even the name and address of the firm was missing....
If the customer had been given complete paperwork, they (and the spark) would have know something was amiss...
It beggars belief to me that someone can sign a form to say they have designed, installed & I&T'd an install when they clearly have not.