The installation stops at the outlet? There is no need for an MWEIC form.
When a PC has a flex from an outlet to the base unit - then two outlets from the base unit to the screen & UPS unit you dont go notifying the volt police? Its the wrong side of the Plug! If u saw 10 extension leads daisy chained we all know R1R2 are miles out - but hey - its the wrong side of the plug?
There are exceptions to evry rule & if I was fitting in a special location then I would test out the RCD or Fit one and have a butchers at the disconnection times.
U were going to tell me why a 3 pin plug is a health risk when fitted on a boiler?
R U a disgruntled RGI or a sparkie with a chip?
When a PC has a flex from an outlet to the base unit - then two outlets from the base unit to the screen & UPS unit you dont go notifying the volt police? Its the wrong side of the Plug! If u saw 10 extension leads daisy chained we all know R1R2 are miles out - but hey - its the wrong side of the plug?
There are exceptions to evry rule & if I was fitting in a special location then I would test out the RCD or Fit one and have a butchers at the disconnection times.
U were going to tell me why a 3 pin plug is a health risk when fitted on a boiler?
R U a disgruntled RGI or a sparkie with a chip?