All wiring now in at our pad, 3 new 2.5 ring finals, 2 extra lighting radials and new circuits for immersion, smoke alarms, cooker circuit working fine. Fuse diagrams and circuit diagrams been done on CAD, so we have a much better system than previously. For example, a supposed 2.5mm ring was in fact broken, and supplied all sockets in the house, on a 32A breaker (18 double sockets on one radial) . Now, with increasing the number of rings, we actually meet the requirements for voltage drop and have a system that will be realistically as far from overload as possible.
Self-hire MFT confirmed that, funny old thing, competence doesnt require a load of paperwork from the council nor a load of certificates from a theory based 2 week part P course. All paperwork has been completed however, the only bit that hasnt is the notification (balls to the council).
Cheers for all the advice on here. Really helped at times to do my rewire safely and get round a number of issues I faced when installing over the past month.
Will be selling my on site guide over the next few weeks as I shant be needing it again.
Self-hire MFT confirmed that, funny old thing, competence doesnt require a load of paperwork from the council nor a load of certificates from a theory based 2 week part P course. All paperwork has been completed however, the only bit that hasnt is the notification (balls to the council).
Cheers for all the advice on here. Really helped at times to do my rewire safely and get round a number of issues I faced when installing over the past month.
Will be selling my on site guide over the next few weeks as I shant be needing it again.